World Bank, IFC fund Masdar’s Uzbekistan solar-plus-storage project with 63MW BESS
The World Bank and other financial institutions will provide a US$159 million package for a 250MW solar PV and 63MW battery energy storage system (BESS) project from UAE state-owned renewable energy developer Masdar in Uzbekistan.
![World Bank, IFC fund Masdar’s Uzbekistan solar-plus-storage project with 63MW BESS](https://portfolio.energyhub.eu/image/thumbnail/md/https://e-hub.cz/img/res/ceny/2200-dollar-499481-480.jpg)
You are not logged in
If you want to read more, join the ENERGY-HUB club
LoginTry the monthly membership in the ENERGY-HUB club for free!
Related articles
Stem, Prometheus complete first of three 2024 BESS projects for Arizona co-ops
System integrator Stem Inc and developer Prometheus Power have deployed the first of three BESS projects in Arizona for utilities…
Plus Power closes financing on 300MWh BESS project with ISO New England capacity contract
Plus Power has closed financing for a 150MW/300MWh standalone battery energy storage system (BESS) project in Massachusetts, US.
Austria making €18 million available for medium-scale energy storage projects
Some €17.9 million (US$19 million) in grants will be made available for ‘medium size’ distributed-scale energy storage projects in…
New York puts US$5 million to long-duration energy storage projects
US$5 million will be made available for long-duration energy storage (LDES) projects via a competitive solicitation run by the New…
Ethical Power gets approval for 65MW solar-plus-storage project in New Zealand
Developer Ethical Power has received planning consent for a 65MW solar-plus-storage project near Christchurch, New Zealand.
ENERGY-HUB is a modern independent platformsharing news and analytic articles from the energy sector on a daily basis. Within our portfolio we monitor czech, slovak and foreign press releases.